From: route@monster.com
Sent: Friday, April 15, 2016 10:22 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: CS UT
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
DEREK CLARKE 2900 Kingsway Road Fort Washington, MD 20744 Cell
Phone 202-957-2153 Email:
derekclarke55@aol.com Professional Experience: Facilities Engineer (OJT) General Communications Inc., Anchorage
Alaska
07/2014- 10/2014 ·
Plans and implements the design of plants, offices, and
production lines in order to maximize the use of available space and improve
production efficiency. ·
Estimated
costs related to layout design, including equipment and materials, labor, etc
and monitor the construction process. ·
Researched
products/equipment, fuse panels, racks or fixtures for purchase ·
Developed
Engineering Request into SOW for management approval ·
Developed
Install Package for installers: in house or contractor ·
Project
manager and inspector both during and completed work ·
Ensured
that established efficiency and safety targets are carried out ·
Knowledge
of concepts, practices, and procedures for telecomm environment: data
centers, head-ends, hubs, for power, HVACs, cabling, rack space ·
Working
knowledge of: NEC, OSHA, Installation guidelines: Telecordia GR-275 ·
BOM and cost estimating expertise for DC power and telecom
equipment ·
Mentored by BSEE on AC/DC power, safety, NEC codes, HVACs,
battery back up Field Operations Technician
01/2014 - 08/2014 General Communications Inc., Anchorage Alaska ·
Perform field installs to support: Cable modem MTO
SONET/Ethernet GB network ·
General Packet Radio System Architecture supports
SONET/OC-3; Ethernet services ·
Installation of racks,
power wiring - lacing, coax cable, fiber/jumper management ·
Installation of network equipment: Juniper Routers, ArrIs
E6000 Routers; Alcatel 7705 ·
Marconi LH RF Antenna System; Cisco 9010,9001,ASA 5500, ME
3600;Valere rectifiers; ·
Telect fuse panels;Cyan Z77,Z33;Z22 Metro and Regional core,
SONET/SDH;C ·
CarrierEthernet. ·
General Dynamics 1184 (1.8 meter) Antenna for Ku-Band and
C-Band systems ·
Comtech Satellite modems, Smart UPS systems ·
Perform RF site surveys ·
Test coax splitter/combiner for uplink/downlink using JDSU
DSAM ·
Lacing Skills: Kansas and Chicago stitch ·
Working knowledge of Telecordia GR-1275 Installation
Guidelines Field Operations Technician, (Contract)
09/2013- 12/2013 TDS Telecom Broadband Project, Maine ICON COMMUNICATIONS, Arkansas ·
Installed 4-O and #2 AWG when required Breaker
Distribution Fuse Bay ( BDFB ) ·
Installed racks/fiber trays inside CO's Nodes, Cell
Sites, and Charles boxes ·
Performed pre installation check to be sure Telect panel
provided -24v or -48 ·
Installed Cyan Z77;Z33;Z22 Packet Optical for metro and
regional core and hub deployments supports: SONET & DWDM Carrier Ethernet
2.0 ·
Provisioned, commissioned and configured equipment during
test and turn MOP's ·
Built fiber trays in CO sites where needed. ·
Laced all power cables per
installation guidelines: Chicago and Kansas city stitches ·
Installed SFP/XFP and fiber single
mode and multimode jumpers, performed power test ·
Installed Accedian NID to connect
to backhaul network and checked configuration for report to NOC ·
Performed CO instalation and MOP'S Field Operations Technician, (Contract) Verizon, Wind-Stream FTTC Project WV and OH
06/2009- 09/2013 ICON COMMUNICATIONS, Arkansas ·
Performed power verification and power up of equipment in
the field ·
Turned up fiber links to SFP/XFP's; perform fiber power
testing ·
Performed installation at cell site shelters and Charles
boxes ·
Installed CYAN Z Series; Accedian NID's and Telect, fusee
panels, Valere Rectifiers ·
Certified level 3 technician:
power/ transport/switch ·
Completed AT&T TP76300 and
Verizon IP72202online courses OSP Design Engineer(OSP Contract)
02/2008-6/2009 Fiber to Cell Site, Wind-Stream KY and WV Performed R/W and permit surveys Performed ISP survey to verify Ethernet 7.2 rack
space identified Performed field work for easements, and make ready
pole assessments Performed field work for DOT road crossing for
county roads and state highways Performed field work for RR crossings permits when
applicable BAU fielding from backhaul network to cell tower OSP Engineer/Fielder for Video Ready Access Device (OSP
Contract)
2008 Fiber to the Cell Site Inspector, AT&T San Gabriel Joint Pole Audits, AT&T Northern/Southern CA .
Performed work for the design and installation
of VRAD equipment Performed joint pole field survey and audit work Performed ISP survey from CO to OSP locations Performed make ready
audits using GEO 95, NESC pole knowledge ISP/OSP Engineer Verizon (OSP Contract)2007 OSP Field Engineer CA · Performed
field survey work for FTTH, MDU and MTU work orders · Performed
pole guying and anchoring, HOA, footage, Joint Poles · Performed
aerial field work, ROW, street profiles and permits ·
Performed ISP surveys to very location of OTN FTTP OSP Field Engineer Verizon (OSP Contract) Verizon, Upland, CA2006/7
Performed ROW permitting when
applicable
Performed field work on FTTH work
orders
Performed site walks collected
accurate field notes
Underground, aerial and direct
buried (BAU) FTTP design and engineering FTTP OSP Engineer (OSP Contract) CA National Cable Mining Project (Verizon)2006 ·
Performed trunk audit at CO's to and verified using plant
records ICGS ·
Identified trunks end to end to calculate exact footage at
CO's F2 P-Commit on Premise for AT&T (OSP Contract) Light-Speed Project, AT&T Sacramento CA 2006 ·
Responsible for P-commit F2 pair, run reports for various
USOC codes ·
Applied AT&T applications in performance of work
orders ·
Ran report to insure that the F2 pair was grounded and
bonded Acela Technologies, Inc. Fredrick, MD (Contract)2006/6 Telecom PM
Telecom PM on site providing
technical support of cable plant rehab of Hotel infrastructure
Responsible for demo/installation of
new category 3-5 copper cable
Responsible for installation of
telephone/modem in each room
Trained local talent to place
copper wire, terminate to biscut and test
Supervised installation crews and created daily reports
Met with General Contractor to coordinate cable plant installation
work Bechtel Frederick, Maryland (Contract)2005 FTTN Verizon Project on Premise OSP ·
On premise for Verizon project
verifying plant location records for node placement ·
Place calls to One Call to confirm
underground facilities when required Business Owner:
CEO/President/Trainer Washington
Integrated Technology, Inc., Silver Spring, MD
Director
of Operations and Business
Development
11/1995 - 12/2004
Performed Telco closet audit of 157
site telecom closets
Performed ISP surveys for new PBX
installations
Negotiated and awarded $2.8 million
contract for PBX system
Scheduled and coordinated access for
sub's and crews
Managed all cable installations for
voice and data solutions
Managed installation of 30+
Lucent PBX and voice mail systems
Managed installation of music on hold contractors at 150+ sites
Performed cost estimates, blueprint take-offs and created BOMs
Managed day to day operations of all trouble tickets to resolution Certifications: Convergence
Technology WNCT-1 5/2009 Watershed Networks Affiliations: BICSI
member; SCTE member NPSE
Student Member Continuing Education: GE Map-Sight utility pole data
collection solution software, Device field training OJT training for Facility Engineer 1: AC/DC Power, rectifiers, batteries,
BDFB's, fuse panels, OSHA safety requirements, HVAC, engineering requirements
processes Creating the Statement of Work, installation package, cost
estimating, space requirements for equipment racks, iron racks, grounding,
power wire, testing, MOP'S, telecom space growth requirements. TelcordiaGR1275
Core Installation Guidelines ( 2012 manual ) Cisco
CCNA Training (self study materials) Distributed
Antenna Systems (DAS for Dummies self study book) AT&T
TP 76300 Installation online courses/tests completed (online training) AT&T
Quality Installation (NPE); Electronic Job Folders (EJF) (online training) AT&T
Field View Procedures for Plant Location Records AT&T
Outside Plant Engineering Practices: (U-verse OJT AT&T ) AT&T
Video Ready Access Device Engineering Practices (VRAD'S) Verizon
IP72202 Installation courses completed (online training) Bellcore
Standards Knowledge BICSI
Telecommunication Project Management 110 online course completed BICSI
RCDD Telecom Distribution Design TDM 11 classroom training completed BICSI
Bonding and Grounding online course completed Corning
Bill of Materials (BOM) take-offs, cost estimating for telecom projects, Required tools for performance of OSP aerial fielding; Installer tool
bag; category 5 & 6 testing tool; coax crimpers, Insulated lugs crimper
and Voltage meter. |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|